![]() |
|
|
|||||||
| Register | FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
| Site Home | Forum Home | Photo Gallery | PT Events | PT Videos | Car Videos | Parts Search |
|
![]() |
|
|
LinkBack | Thread Tools | Display Modes |
|
|||
|
..anybody got more information on this. Dealer has had the new 'stutter fix' pcm on order for 5 weeks and now says Chrysler has all pcm's on hold!!!! Wonder if Mopar Stage I is on hold also? This might be the only way to get rid of the miss....
|
|
|||
|
I work for a dealer in Canada and I ordered a pcm for an 02 caravan and its been on back order for 2 weeks already as to why I have no idea!![:I]
__________________
13.88@103mph |
|
|||
|
wow that sux!! i wonder why??
|
|
|||
|
new pcm to day in my ptgt 5 days to get pcm form DC part num 5033062-AK Description module PO 8035027 .my ptgt is a five speed
|
|
|||
|
My TSB18-029-03 PCM was ordered on 8/21 and installed on 9/10. When was the hold supposedly placed on the PCMs?
I do know my car runs better with the new PCM. Shifting seems a little better as well.
__________________
2003 PT Turbo Deep Cranberry \'R\' Package Stock + AutoStick Came off assembly line 1/14/03 (Tuesday) between 2200 and 2300. |
|
|||
|
Mine came in 5 days. (for the stutter) Although the new programing cable has yet to show. 25 days.
Don
__________________
\'03 Inferno Red 5 spd. Hurst shifter,Loaded |
|
|||
|
The PCM will always be on backorder because they are made specifically for your vehicle, Mopar cannot stock them, the order is sent to the supplier and they make your PCM and ship it directly to your dealer, I know this 'cause I was a parts manager at a dealer. The Stage I PCM's are not on hold, they're being shipped out normally, they did fix a minor bug that was in the first 75 produced, rest assured the PCM's are being built and shipped ASAP.
__________________
Patriot Blue 5-Spd, Stage I, Mopar BOV, BTG Intake, Custom 3\" Turbo-Back, Spring Mod, BTG Shock Tower Brace, Vogtland Springs, Koni Shocks, Eibach Sway Bars, Azev Type M 18x8.5 wheels, Ventus K104 tires, Projector Bi-Xenon Lights, Rear spoiler, Autometer Gauges, Illuminated sill plates, K&N Oil Filter, Mopar subwoofer. Mexico City. See pics: http://www.sportcarsforum.com/forum/viewtopic.php?t=715 |
|
|||
|
So you're saying that the PT pcm is only made to order, DCX stocks no parts ahead?
Little PT elves come in at night and make a pcm designed specifically and only for each individual car? |
|
|||
|
Well when I ordered my stage 1 I had to provide vin, it has to be programed into the PCM. My S1 came in two boxes, one from who I ordered it from and one from a company about 10 miles down the road who did the programing. I dont know if this is why or not, but makes sense to me.
__________________
The recipe for perpetual ignorance is: be satisfied with your opinions and content with your knowledge. Elbert Hubbard (1856 - 1915) 2003 Electric Blue GT-30,000 Miles on the clock Stage 1, Greddy Profec II B. Turbo Chargers Wastegate set to 13#. Forge Motors BOV (Blue of course). Brand AMX Intake/AirCooler Pipes/K&N Cone with Snorkel to Fender well, MSD Coil, Live Wires(Blue of course), Factory rear sway bar, KYB struts and shocks, BTG strut tower brace, Suspension Techniques 1.3\" F/R lowering springs, ATP 3” down pipe with high flow cat, BTG axle back exhaust, Rear Spoiler. Russel Brake Lines/Hawk Brake Pads/Power Slot Cyro Rotors on a four corners Support Your Right to Arm Bears
|
|
|||
|
S 1 is a special order PCM that comes directly from the pcm vendor(a process already confirmed by MPP folks).
I have a hard time imagining that the many thousands of standard PT Turbo models being shipped without a PCM. Would DCX have the dealers finish manifacturing them on site? Who handles the dropped and mis installed parts warranty.....it's too much to even imagine. I would sooner believe in the PT elves! |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Chrysler 300C SRT-8 | skylight | PT Cruiser News and Rumors | 7 | 18 Dec 2007 08:16 pm |
| Chrysler Group Launches Top Down Days | skylight | PT Cruiser News and Rumors | 2 | 15 Sep 2004 06:19 pm |
| 2004 Chrysler PT Dream Cruiser Series 3 | skylight | PT Cruiser News and Rumors | 9 | 28 Jan 2004 09:39 pm |
| Chrysler Financial Raffles Off a 2005 Convertible | skylight | PT Cruiser News and Rumors | 5 | 29 Nov 2003 12:24 am |
| Chrysler Group Reports U.S. June Sales | skylight | PT Cruiser News and Rumors | 4 | 29 Jul 2003 04:09 pm |